Whatever happened with the general-contractors?

June 1st, 2007

This was very strange.

Two general-contractors were bidding on our project. One needed a little more time, and one needed a lot more time. We granted the long extension (to May 20) and the architect informed the other contractor of the new timeline. (This is not that unusual: their trades and suppliers are all very busy so getting everyone to return their quotes for the work to be done can be challenging.)

Both contractors were really nice and came across as thoroughly professional, but when it came time to turn in the bids, the contractor who needed the longer extension didn’t arrive.

He didn’t call, didn’t return our 2 phone calls or the calls from the architect over the next few days. He just disappeared. The behaviour seems so out of keeping with the fellow we met that we are a bit concerned that he’s been injured on a work-site. It just doesn’t make much sense that he couldn’t take 30 seconds to say “Sorry, I’m just too busy to take on this project” so the only other (disturbing) explanation we’re left with is that he’s unable to contact us.

The one bid we did receive was, unfortunately, well outside our anticipated budget for the project. He called us to let us know that he was keen to sit down and see where the project could be modified/simplified to reduce the budget, which was nice. We’ll probably wind up doing this once we are more certain what direction we’re going in regarding parking.

Posted by Colin
§
§