Viewing Single Entry

Greener pastures of our own

June 10th, 2008

We’ve found our new project manager!

Last year, our new PM had actually looked at our plans at the request of the architect and turned down the job as he was already stretched thin. He also wasn’t very keen on the stick-frame construction that had been proposed at the time.

Fast-forward a year and it turns out he had been selected by our old PM to lay the Durisol ICFs for the project. But we met with him today and some really interesting things came to light:

  1. He usually works as a general contractor and has a full team of trades on hand to do the work (so he can usually work much faster than other General Contractors who have to hire external trades, whose availability is highly variable).
  2. He’s been building Eco-Block ICF homes for many years and has a wealth of experience with ICF type products.
  3. He seems like just a great, smart guy who will be really easy to work with.
  4. He works on exactly one project at a time.
  5. He works the job site himself, so he’s there all day to make sure things are being done correctly (often by him).
  6. Even our old PM said he thinks we might be in better hands with this fellow, based on his wealth of experience

I think we will be really happy if we have no more surprises on this project, but so far the majority of our surprise “missteps” have actually had us wind up in a better place than before.

The plan is now to start August 1.

Posted by Colin
§
§